Reservoir Engineering & Simulation
The purpose of reservoir engineering is to provide the facts, information and knowledge necessary to control operations to obtain the maximum possible recovery from a reservoir at the least possible cost. Reservoir simulation is an area of reservoir engineering that combines physics, mathematics, and computer programming to a reservoir model allows the analysis and the prediction of the fluid behavior in the reservoir over time. It can be considered as the process of mimicking the behavior of fluid flow in apetroleum reservoir system(including reservoir rock and fluids, aquifer,surface and subsurface facilities) using either physical or mathematical models.It’s a valuable tool to understand the oil and gas reservoir performance under various operating strategies.
ThEC provides our clients with the following RES services:
Reservoir engineering services:
- Reservoir fluid characterization and modeling
- Routine and special core analysis, interpretation and modeling
- Determine the reservoir production mechanism using reservoir production data
- Reservoir compartmentalization using dynamic data
- Decline curve analysis to determine the production forecast and reserves
- Material balance to determine volume and forecast production
- Determining fluid contacts based on various sources
- Well test interpretation to determine the reservoirs and well’s characteristics
Reservoir engineering services:
- Static model analysis and quality checking
- 3D model upscaling
- Reservoir fluid characterization and EOS tuning to extract proper fluid model
- Combing dynamic and static data to determine flow units
- Determining proper type of simulation model:
- Black oil
- Compositional
- Thermal
- Sector modeling
- Single well modeling (conventional &un-conventional)
- Assisted history matching and base case scenario forecasting
- production forecasting for different development strategies
- uncertainty and optimization analysis
- optimization under uncertainty analysis (special service for reservoirs with high level of risk)
- secondary oil recovery analysis using immiscible gas, water & WAG if applicable